• Login
    Search 
    •   Home
    • UTSA Faculty and Staff Works
    • Center for Advanced Manufacturing and Lean Systems
    • 24th International Conference on Flexible Automation and Intelligent Manufacturing
    • Search
    •   Home
    • UTSA Faculty and Staff Works
    • Center for Advanced Manufacturing and Lean Systems
    • 24th International Conference on Flexible Automation and Intelligent Manufacturing
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • xmlui.Discovery.AbstractSearch.sort_by.dc.description.department_sort_asc
    • xmlui.Discovery.AbstractSearch.sort_by.dc.description.department_sort_desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Procurement policy of vulnerable parts with jointly distributed lifespan 

    Li, Cun Rong; Sarker, Bhaba R.; Yi, Hui Zhi; Yu, Meng (Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, 2014)
    Vulnerable parts exist in most machines or equipment. Failure of those vulnerable parts may result in damage of the machine or the product, and may sometimes cause unnecessary down-time within a production cycle, all of ...
    Thumbnail

    Minimization of transportation and installation time for offshore wind turbines 

    Faiz, Tasnim Ibn; Sarker, Bhaba R. (Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, 2014)
    The most challenging aspect of introducing an offshore wind energy facility is high cost of capital for transportation and installation of wind turbines. The cost associated with transportation and installation depends on ...
    Thumbnail

    Impact of finite life cycle to a consignment stocking supply chain with uncertain demand 

    Yi, Hui Zhi; Sarker, Bhaba R.; Li, Cun Rong (Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, 2014)
    There are usually two reasons that force a supply chain to adopt the consignment stocking policy: the high demand variance and the high risk of obsolescence. This research aims to study the influences of these two issues ...

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    TDL
    Theme by 
    Atmire NV
     

     

    Browse

    All of Runner Research PressCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsDepartmentsThis CollectionBy Issue DateAuthorsTitlesSubjectsDepartments

    My Account

    Login

    Discover

    Author
    Sarker, Bhaba R. (3)
    Li, Cun Rong (2)Yi, Hui zhi (2)Faiz, Tasnim Ibn (1)Yu, Meng (1)SubjectProduct life cycle (2)Production planning (2)Inventory control (1)Machine parts--Failures (1)Machine-tools--Maintenance and repair--Mathematical models (1)Offshore wind power plants--Costs (1)Wind turbines--Installation--Waste minimization (1)Wind turbines--Transportation--Waste minimization (1)... View MoreDate Issued2014 (3)Has File(s)Yes (3)

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    TDL
    Theme by 
    Atmire NV