Minimization of transportation and installation time for offshore wind turbines

dc.contributorInternational FAIM Conference 24th : 2014 : San Antonio, Texas
dc.contributorUniversity of Texas at San Antonio. Center for Advanced Manufacturing and Lean Systems
dc.contributor.authorFaiz, Tasnim Ibn
dc.contributor.authorSarker, Bhaba R.
dc.date.accessioned2022-07-11T17:35:50Z
dc.date.available2022-07-11T17:35:50Z
dc.date.issued2014
dc.descriptionPaper presented at the Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, held May 20-23, 2014 in San Antonio, Texas, and organized by the Center for Advanced Manufacturing and Lean Systems, University of Texas at San Antonio
dc.descriptionIncludes bibliographical references
dc.description.abstractThe most challenging aspect of introducing an offshore wind energy facility is high cost of capital for transportation and installation of wind turbines. The cost associated with transportation and installation depends on the required time to complete these processes and the time requirement can be minimized by optimum selection of many variables of transportation and installation operations such as onshore preassembly of turbines, rated power output of each turbine and number of turbines in the wind farm. Impact of these decision variables on total time requirement of transportation and installation is investigated in this paper, and a time estimation model for wind turbine installation and transportation is developed. Effect of wind farm and vessel parameters on time requirement is studied. Also a numerical study is performed to illustrate the model. The results show that total time requirement is significantly impacted by turbine size and pre-assembly method.
dc.identifier.otherhttp://dx.doi.org/10.14809/faim.2014.1039
dc.identifier.urihttps://hdl.handle.net/20.500.12588/1047
dc.language.isoen_US
dc.publisherDEStech Publications, Inc.
dc.relation.ispartofseriesProceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing
dc.subjectWind turbines--Transportation--Waste minimization
dc.subjectWind turbines--Installation--Waste minimization
dc.subjectOffshore wind power plants--Costs
dc.titleMinimization of transportation and installation time for offshore wind turbines
dc.typeArticle